The German Navy ship was towed into the 38,000m2 dry dock to undergo scheduled maintenance and repairs as well as measures to maintain its operational readiness. The work to be carried out ranges from the replacement of interior components in the cabins to a general overhaul of the engines and optional modernisation measures for entire...Read More
Recent Comments