The scope of the work ranges from minor tasks such as the replacement of cabin furniture to major engine overhauls and the optional adaptation of entire systems. The ship will be berthed in the almost 38,000 m² dock for the work. The commissioning process will take place on the shipyard’s outfitting pier and at sea.
EGV BERLIN is the largest ship of the German Navy, alongside EGV FRANKFURT AM MAIN and EGV BONN. Together with her two sister ships, EGV BERLIN provides comprehensive logistical and medical support at sea for the German Navy and allied navies worldwide and at any time.